TEKNOPARK 3TH STAGE BİM PROJECT
TEKNOPARK 3.ETAP BİM PROJESİ-NAVISWORK
TEKNOPARK 3.ETAP BİM PROJESİ-BIM360
Chimney cover levels were taken with the data obtained from the surface created according to the landscape elevations.
Outputs from mechanical Revit were transferred to the infrastructure.
Establishments and galleries from the static were coordinated with the infrastructure.
As a result; Runs created in naviswork have been uploaded to the BIM360 platform. It was presented to the Employer as a complete BIM360 project for infrastructure.
TASHKENT THEMEPARK BİM PROJECT
TASHKENT THEMEPARK-BIM PROJESİ
TASHKENT THEMEPARK-YANGIN YOLU ANALİZİ
Since the road project was modeled with Civil3d, the chimney cover levels were automatically taken in accordance with the landscape.
Outputs from mechanical Revit were transferred to the infrastructure.
Static shopping buildings were coordinated with the infrastructure.
As a result; Infrastructure lines in narrow streets were overlapped and resolved in naviswork . The infrastructure project has been uploaded to the BIM360 platform. Since it was our first experience, there were some shortcomings.
Analysis was made to check the fire truck turning.