HADIMKÖY INDUSTRIAL SITE PROJECT
HADIMKÖY SANAYİİ SİTESİ-INFRAWORKS MODELLEME
HADIMKÖY SANAYİİ SİTESİ-TRAFİK SİMÜLASYONU
By integrating map readings and google earth elevations, the terrain was modeled according to the real situation.
The proposal received from the City Planner, roads and parcelization were transferred to the model.
According to the contradictions in the model, the new proposal for parcelization, roads and squares were shared with the City Planner.
Curves were determined for the truck after the road turns and the necessary arrangements were made.
Roads, streams and infrastructure were finalized with the requirements of the Employer, City Planner and Technique.
Rainwater basins were created according to the land model.
The employer's demand for traffic simulation was met by us.
As a result; roads and infrastructure were created in a way that would be useful in the operation in accordance with the land .
TURKMENISTAN NEW APRON AND HANGAR BUILDING
All infrastructural elements and pavement concrete level on the Airside side (apron) were modeled.
Open-channel elevation and dimensions are resolved with Civil3D.
Landside elevations are resolved with Civil3D.
Infrastructure design and calculations were made with Urbano.
All the work done was combined in Infraworks and finalized.
The employer was given a more understandable and fully 3D solution.
As a result; As the project is prepared in 3D, all errors and conflicts appear while the work continues and the project, which has a 100% solution, is given to the field.